Canada. Rafferty-Alameda Project Environmental Assessment Panel

Zona de identificação

tipo de entidade

Public Inquiry

Forma autorizada do nome

Canada. Rafferty-Alameda Project Environmental Assessment Panel

Forma(s) paralela(s) de nome

  • Canada. Commission d'évaluation environnementale du projet Rafferty-Alameda

Forma normalizada do nome de acordo com outras regras

Outra(s) forma(s) de nome

  • Rafferty-Alameda Project Environmental Assessment Panel (Canada)
  • Canada. Federal Environmental Assessment Review Office. Rafferty-Alameda Project Environmental Assessment Panel
  • Canada.‏ Bureau fédéral d'examen des évaluations environnementales.‏ ‎ Commission d'évaluation environnementale du projet Rafferty-Alameda‏
  • Commission d'évaluation environnementale du projet Rafferty-Alameda (Canada)
  • Kanada Rafferty - Alameda Project Environmental Assessment Panel
  • Kanada. Commission d'Evaluation Environnementale du Projet Rafferty-Alameda
  • Commission d'évaluation environnementale du projet Rafferty-Alameda (Kanada)

identificadores para entidades coletivas

área de descrição

Datas de existência

1991

Histórico

Locais

Estado Legal

funções, ocupações e atividades

From the executive summary of the final report:

The Panel’s mandate, issued by the Minister, was “to undertake a review of the environmental and directly related social impacts (resulting from changes to the biophysical environment) of the Rafferty-Alameda Dam Project.” The Panel also had the mandate to review and make recommendations concerning mitigation measures and the operation and structure of the dams. ... The Panel include in its public review the significant and moderate impacts that could not be mitigated with known technology or for which no mitigation was provided as stipulated in Environment Canada’s IEE. Project impacts that were considered by the Panel included those intended and beneficial impacts that relate to the Project’s water management objectives, and other beneficial or adverse impacts not directly related to the objectives. There are several specific Project objectives related to flood control, water supply and recreation. Some of these objectives are in direct conflict with each other (e.g., flood control argues for keeping the reservoir levels low, whereas water supply argues for keeping the reservoir levels high). The conflicting nature of some of the objectives, the extreme variability of flows in the Souris basin and the apparent scarcity of water to meet consumption, evaporative losses and targets for apportionment to North Dakota, means that there is not much latitude in reservoir operations to meet all objectives.

Mandatos/Fontes de autoridade

On February 5, 1991 a three-person panel appointed by federal Minister of the Environment.
On February 8, 1991, Mr. Justice Muldoon of the Federal Court issued an order requiring additional impacts were considered.

Estruturas internas/genealogia

Contexto geral

Área de relacionamento

Entidade relacionada

Archer, John Hall (Dr.), 1914-2004 (1914-2004)

Identifier of related entity

PA 286

Categoria da relação

associativa

Tipo de relação

Archer, John Hall (Dr.), 1914-2004

is member of

Canada. Rafferty-Alameda Project Environmental Assessment Panel

Datas da relação

1999-02-05 - 1991-09-30

Descrição da relação

Área de pontos de acesso

Pontos de acesso - Assuntos

Pontos de acesso - Locais

Ocupações

Zona do controlo

Identificador de autoridade arquivística de documentos

Identificador da instituição

Regras ou convenções utilizadas

Estatuto

Revisto

Nível de detalhe

Mínimo

Datas de criação, revisão ou eliminação

2019-09-11 (Revision)

Línguas e escritas

  • inglês

Script(s)

  • latim

Fontes

Rafferty-Alameda Dam Project : Report of the Environmental Assessment Panel. Ottawa: Federal Environmental Assessment Review Office, 1991-09.

Notas de manutenção

  • Área de transferência

  • Exportar

  • EAC

Assuntos relacionados

Locais relacionados