Canada. Rafferty-Alameda Project Environmental Assessment Panel

Identificatie

Soort entiteit

Public Inquiry

Geauthoriseerde naam

Canada. Rafferty-Alameda Project Environmental Assessment Panel

Parallelle vormen van de naam

  • Canada. Commission d'évaluation environnementale du projet Rafferty-Alameda

Gestandaardiseerde naamvorm(en) volgens andere regels.

Aandere naamsvormen

  • Rafferty-Alameda Project Environmental Assessment Panel (Canada)
  • Canada. Federal Environmental Assessment Review Office. Rafferty-Alameda Project Environmental Assessment Panel
  • Canada.‏ Bureau fédéral d'examen des évaluations environnementales.‏ ‎ Commission d'évaluation environnementale du projet Rafferty-Alameda‏
  • Commission d'évaluation environnementale du projet Rafferty-Alameda (Canada)
  • Kanada Rafferty - Alameda Project Environmental Assessment Panel
  • Kanada. Commission d'Evaluation Environnementale du Projet Rafferty-Alameda
  • Commission d'évaluation environnementale du projet Rafferty-Alameda (Kanada)

Identificatiecode voor organisaties

Beschrijving

Bestaansperiode

1991

Geschiedenis

Plaatsen

Rechtsvorm

Functies, beroepen en activiteiten

From the executive summary of the final report:

The Panel’s mandate, issued by the Minister, was “to undertake a review of the environmental and directly related social impacts (resulting from changes to the biophysical environment) of the Rafferty-Alameda Dam Project.” The Panel also had the mandate to review and make recommendations concerning mitigation measures and the operation and structure of the dams. ... The Panel include in its public review the significant and moderate impacts that could not be mitigated with known technology or for which no mitigation was provided as stipulated in Environment Canada’s IEE. Project impacts that were considered by the Panel included those intended and beneficial impacts that relate to the Project’s water management objectives, and other beneficial or adverse impacts not directly related to the objectives. There are several specific Project objectives related to flood control, water supply and recreation. Some of these objectives are in direct conflict with each other (e.g., flood control argues for keeping the reservoir levels low, whereas water supply argues for keeping the reservoir levels high). The conflicting nature of some of the objectives, the extreme variability of flows in the Souris basin and the apparent scarcity of water to meet consumption, evaporative losses and targets for apportionment to North Dakota, means that there is not much latitude in reservoir operations to meet all objectives.

Mandaat/bronnen van bevoegdheid

On February 5, 1991 a three-person panel appointed by federal Minister of the Environment.
On February 8, 1991, Mr. Justice Muldoon of the Federal Court issued an order requiring additional impacts were considered.

Interne structuren / genealogie

Algemene context

relaties

Related entity

Archer, John Hall (Dr.), 1914-2004 (1914-2004)

Identifier of related entity

PA 286

Soort relatie

associative

Type of relationship

Archer, John Hall (Dr.), 1914-2004

is member of

Canada. Rafferty-Alameda Project Environmental Assessment Panel

Datering van de relatie

1999-02-05 - 1991-09-30

Beschrijving van de relatie

Access points area

Onderwerp trefwoord

Geografische trefwoorden

Occupations

Beheer

Authority record identifier

Identificatiecode van de instelling

Toegepaste regels en/of conventies

Status

Herzien

Niveau van detaillering

Minimaal

Datering van aanmaak, herziening of verwijdering

2019-09-11 (Revision)

Taal (talen)

  • Engels

Schrift(en)

  • Latijn

Bronnen

Rafferty-Alameda Dam Project : Report of the Environmental Assessment Panel. Ottawa: Federal Environmental Assessment Review Office, 1991-09.

Onderhoudsaantekeningen

  • Clipboard

  • Export

  • EAC

Related subjects

Related places