Canada. Rafferty-Alameda Project Environmental Assessment Panel

Área de identidad

Tipo de entidad

Public Inquiry

Forma autorizada del nombre

Canada. Rafferty-Alameda Project Environmental Assessment Panel

Forma(s) paralela(s) de nombre

  • Canada. Commission d'évaluation environnementale du projet Rafferty-Alameda

Forma(s) normalizada del nombre, de acuerdo a otras reglas

Otra(s) forma(s) de nombre

  • Rafferty-Alameda Project Environmental Assessment Panel (Canada)
  • Canada. Federal Environmental Assessment Review Office. Rafferty-Alameda Project Environmental Assessment Panel
  • Canada.‏ Bureau fédéral d'examen des évaluations environnementales.‏ ‎ Commission d'évaluation environnementale du projet Rafferty-Alameda‏
  • Commission d'évaluation environnementale du projet Rafferty-Alameda (Canada)
  • Kanada Rafferty - Alameda Project Environmental Assessment Panel
  • Kanada. Commission d'Evaluation Environnementale du Projet Rafferty-Alameda
  • Commission d'évaluation environnementale du projet Rafferty-Alameda (Kanada)

Identificadores para instituciones

Área de descripción

Fechas de existencia

1991

Historia

Lugares

Estatuto jurídico

Funciones, ocupaciones y actividades

From the executive summary of the final report:

The Panel’s mandate, issued by the Minister, was “to undertake a review of the environmental and directly related social impacts (resulting from changes to the biophysical environment) of the Rafferty-Alameda Dam Project.” The Panel also had the mandate to review and make recommendations concerning mitigation measures and the operation and structure of the dams. ... The Panel include in its public review the significant and moderate impacts that could not be mitigated with known technology or for which no mitigation was provided as stipulated in Environment Canada’s IEE. Project impacts that were considered by the Panel included those intended and beneficial impacts that relate to the Project’s water management objectives, and other beneficial or adverse impacts not directly related to the objectives. There are several specific Project objectives related to flood control, water supply and recreation. Some of these objectives are in direct conflict with each other (e.g., flood control argues for keeping the reservoir levels low, whereas water supply argues for keeping the reservoir levels high). The conflicting nature of some of the objectives, the extreme variability of flows in the Souris basin and the apparent scarcity of water to meet consumption, evaporative losses and targets for apportionment to North Dakota, means that there is not much latitude in reservoir operations to meet all objectives.

Mandatos/fuentes de autoridad

On February 5, 1991 a three-person panel appointed by federal Minister of the Environment.
On February 8, 1991, Mr. Justice Muldoon of the Federal Court issued an order requiring additional impacts were considered.

Estructura/genealogía interna

Contexto general

Área de relaciones

Entidad relacionada

Archer, John H., 1914-2004 (1914-2004)

Identificador de la entidad relacionada

PA 286

Categoría de la relación

asociativa

Tipo de relación

Archer, John H., 1914-2004

is member of

Canada. Rafferty-Alameda Project Environmental Assessment Panel

Fechas de la relación

1999-02-05 - 1991-09-30

Descripción de la relación

Área de puntos de acceso

Puntos de acceso por materia

Puntos de acceso por lugar

Occupations

Área de control

Identificador de registro de autoridad

Identificador de la institución

Reglas y/o convenciones usadas

Estado de elaboración

Revisado

Nivel de detalle

Básico

Fechas de creación, revisión o eliminación

2019-09-11 (Revision)

Idioma(s)

  • inglés

Escritura(s)

  • latín

Fuentes

Rafferty-Alameda Dam Project : Report of the Environmental Assessment Panel. Ottawa: Federal Environmental Assessment Review Office, 1991-09.

Notas de mantención

  • Portapapeles

  • Exportar

  • EAC

Materias relacionadas

Lugares relacionados