Oil wells - Drilling rigs

Taxonomy

Code

Scope note(s)

Source note(s)

  • PAASH 2020

Display note(s)

Hierarchical terms

Oil wells - Drilling rigs

Oil wells - Drilling rigs

Equivalent terms

Oil wells - Drilling rigs

  • UF Oil well drilling rigs
  • UF Oil derricks
  • UF Oil well drill rigs

Associated terms

Oil wells - Drilling rigs

123 Archival description results for Oil wells - Drilling rigs

123 results directly related Exclude narrower terms

ENERGY SASKATCHEWAN

  • FILM R-4006
  • Item
  • 1999 or before

Documentary: Looks at the types of energy resources that are used in Saskatchewan and how they are used. These energy resources include gas, oil, solar, wind, water, geothermal, wood, peat beds and coal. Also discussed is the research going on to find the most efficient ways to use each resource by way of co-generation and conservation methods and how a combination of different energy sources might be used to obtain the most efficient use of each. Includes good shots of men operating an oil drilling rig and of a large dragline in operation at an open-pit coal mine. See FILM R-4006 copy 1 and FILM R-4006 copy 2. CAUTION: FILM R-4006 copy 1 has a slight odor like that of vinegar - this could be an indication of VINEGAR SYNDROME.

CHERRY FILM PRODUCTIONS LTD.

Oil and gas mining and production sites in southeast Saskatchewan

Aerial (01 to 53) and eye-level (79 to 163, 165 to 167) views of oil and gas mining and production sites throughout southeast Saskatchewan. 01 to 04: Steelman Gas Plant. 05 to 08: Ashland Alameda Unit Battery. 09 to 11: Gulf Alameda Central Unit Battery. 12 to 15: Steelman Gas Compressor Station. 16 to 20: Gulf Alameda North Unit Battery. 21 to 23: Wielmer Producers Pipeline Terminal. 24 to 25: Marathon Kenosee Battery. 26 to 27: Service rig on well, Tidewater Kenosee Crown. 28 to 29: Marathon Kenosee Battery. 30 to 31: Imperial Star Valley Battery. 32 to 35: Imperial Oil Ltd. Lost Horse Hills Unit Battery. 36 to 39: Westspur Pipelines Midale Terminal. 40 to 43: Shell Midale Plant. 44 to 45: Long Stroke pumping unit for Shell Midale. 46 to 47: Regent Drilling rig for Bralorne Weyburn. 48 to 49: Two service rigs repairing the Weyburn unit wells. 50 to 53: Pan Canadian Weyburn Unit Plant. 79 to 89: Regent Drilling rig #22 for Bralorne Weyburn. 90 to 93: Regent Drilling rig. 94 to 101: Pan Canadian Weyburn Unit Plant Production and Water Injection Plant. 102 to 111: Weyburn Unit oil well. 112 to 113: Service rig repairs to Weyburn Unit water source well. 114 to 125: Weyburn Unit oil well pump repairs performed by service rig. 126 to 133: Service rig repairing Weyburn Unit oil field. 134 to 135: Reda submersible pump at Midale. 136 to 137: Small pumping unit at Midale. 138 to 139: Long Stroke pumping unit for Shell Midale. 140 to 145: Benson Central Waterflood Treating Plant. 146 to 156: Steelman Gas Plant. 157 to 160: B.A.C.D. Lischka multi-zone oil producer at Steelman.161 to 163, 165 to 167: Pumping unit, Midale field.

Weston, Bruce

Results 31 to 40 of 123