Architect's sketch of mall south of Legislative Building, proposed in Wascana Centre Plan
- R-A10705
- Unidad documental simple
- 1962
Architect's sketch of mall south of Legislative Building, proposed in Wascana Centre Plan.
3 resultados con objetos digitales Muestra los resultados con objetos digitales
Architect's sketch of mall south of Legislative Building, proposed in Wascana Centre Plan
Architect's sketch of mall south of Legislative Building, proposed in Wascana Centre Plan.
Composite High School at Canora.
Reroofing school at Rama
Grolle Architect & Engineer, 1971-
Library Conversion of Canora Town Offices
Items relate to proposed library conversion of Canora town offices.
Tom White Architect Ltd.
Items consists of sewage and water plans and other community improvements for the village of Alvena, including the following:
Project: Arena Site Survey and Utility Extension; Drawing Names: Community Centre and School Grounds Improvement [S487-C0]; and Community Centre and School Grounds Improvement [S487-C1].
Project: Sewage Collection System; Drawing Name: Title Page.
Project: Sewer Extension; Drawing Name: Plan Profile - Poplar Ave from MH No.7 to MH No. 29 [SB61-C1].
Drawing Name: Preliminary Sketch.
Drawing Name: Proposed Sewage Collection System [6113-SM-P].
Drawing Name: Sewage Collection System [6113-SM-1].
Drawing Name: Sewage Lagoon [6113-SD-1].
Drawing Name: Sewer Main Crossing Canadian National Railways [6113-RR-1].
Drawing Name: Sewer Profiles - 3rd St. W, 2nd St. W, 1st St. W, Main St, 1st St. E [6113-SP-3].
Drawing Name: Sewer Profiles - Outfall Main [6113-SP-1].
Drawing Name: Sewer Profiles - Railway Ave.-Railway Crossings, Poplar Ave. [6113-SP-2].
Drawing Name: Water Distribution System [6113-WM-1].
Associated Engineering Ltd.
Plan of Fort Hamilton [Fort Whoop-Up]
Compaigne de lithographie Burland-Desbarats
[Ceepee, Sask. Bridge over the North Saskatchewan River: Horizontal Tie]
Rough sketch of Borden Bridge over the North Saskatchewan River showing the horizontal tie.
Ceepee Bridge (now known as Borden Bridge) was constructed over the North Saskatchewan River between Saskatoon and the Battlefords in 1936.by R.J. Arrand Construction Company of Saskatoon with engineering / design by Chalmers Jack Mackenzie and Beverley A. Evans. The bridge opened in 1937 and closed in 1985.
Canada. Dept. of Public Works
Ceepee, Sask.: bridge over the North Saskatchewan River: end bearing girder span No. 7
Item is a technical/architectural drawing for the Ceepee bridge over the North Saskatchewan River showing end bearing girder span No. 7.
Ceepee Bridge (now known as Borden Bridge) was constructed over the North Saskatchewan River between Saskatoon and the Battlefords in November 1936.by R.J. Arrand Construction Company of Saskatoon with engineering / design by Chalmers Jack Mackenzie and Beverley A. Evans. The bridge opened in 1937 and closed in 1985.
Canada. Dept. of Public Works